North Shore Drive

The sanitary manholes have been adjusted to match the new road elevation. Please use caution while traveling down North Shore Drive as the area around the manholes has been removed. The construction barrels indicate where each manhole is. The ditching and culvert installation along North Shore Drive will begin October 23, 2020. Individual residents will be notified before their is worked on.


North Shore Bridge

The North Shore bridge has been completely deconstructed and is in the beginning stages of the reconstruction process. The false work for the bridge deck is being installed in preparation for the bridge deck concrete pour scheduled for October 29th or 30th. The bridge will remain open to boater traffic throughout the reconstruction process.


Valencia Drive

The sanitary manholes have been adjusted to match the new road elevation. Please use caution while traveling down North Shore Drive as the area around the manholes has been removed. The construction barrels indicate where each manhole is. The construction on the new Winter Drive will begin immediately after the North Shore ditching and culvert install is complete.


Townhall Road

The binder layer of asphalt pavement has been placed on the entire stretch of Townhall Road. The binder layer has also been placed throughout the Townhall building parking lot. The final layer of asphalt pavement will be placed as soon as North Shore Drive and Valencia Drive have been final paved.


Theatre Road

The binder layer of asphalt pavement has been placed on the entire stretch of Theatre Road. The final layer of asphalt pavement will be placed as soon as North Shore Drive and Valencia Drive have been final paved.


North Shore Drive

The asphalt binder coat has been applied to the entire North Shore Drive roadway. There are traffic control barrels overtop of the individual manholes. Starting October 9th, 2020, the manholes along North Shore Drive will begin to be adjusted to the appropriate height to match the roadway. The ditching along North Shore Drive will begin immediately following the manhole adjustment work. The driveway section removal and the culvert installation will begin simultaneously with the ditching.

North Shore Bridge

The top slab of the North Shore Drive bridge has been completely removed and the top flanges of the bridge girder is being prepped for the new slab to be constructed. Throughout this process, the bridge will remain open and accessible to boat through traffic but temporarily closed to vehicle traffic.

Valencia Drive

Most of the asphalt binder coat has been applied to Valencia Drive. There is a section of the roadway that has no asphalt binder due to the subsurface being too soft during the paving process.


Updated: Oct 8

Please use caution while traveling along North Shore Drive.


Pulverizing started at the intersection of Borg Road and North Shore Drive on Thursday, September 10th, 2020. While North Shore Drive is being Pulverized, it with be in its gravel state, but the road will be open to local traffic from both directions. The pulverizing is scheduled to reach the North Shore bridge by the end of the day Monday, September 14th, 2020.